国产99久久久久久免费看,CAOPORN国产精品免费视频,狠狠色噜噜狠狠狠狠97首创麻豆,中文字幕无码毛片免费看

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
精品无码国产av一区二区| 中文在线ずっと好きだった| 高清中文字幕在线a片| 曰韩精品无码一区二区三区| 国产中文精品无码欧美综合小说| av无码天堂一区二区三区| 日日碰狠狠躁久久躁| 久久精品九九亚洲精品| 在线永久免费观看黄网站| 狠狠色成人一区二区三区| 丰满熟妇乱又伦在线无码视频| 色综合久久一区二区三区| 久久夜色精品国产噜噜亚洲av| 熟女大屁股白浆一区二区| 白嫩无码人妻丰满熟妇啪啪区百度 | 国产男女无遮挡猛进猛出| 大白肥妇bbvbbw高潮| 无码专区人妻系列日韩精品| 免费看又黄又无码的网站| 男女猛烈激情XX00免费视频| 内射人妻无码色av麻豆| 日本久久久久久久做爰片日本| 精品无码av一区二区三区不卡| 无遮挡啪啪摇乳动态图GIF | 99国产精品久久久久久久日本竹 | 精品久久久久久中文字幕人妻最新| 奇米影视7777久久精品人人爽 | 久久av色欲av久久蜜桃麻豆| 国产美女视频国产视视频| 日产精品高潮呻吟av久久| 和少妇人妻邻居做爰无码| 欧美三级a做爰在线观看| 国产精品久久香蕉免费播放| 中文字幕亚洲一区二区va在线 | 亚洲最大天堂无码精品区| 亚洲欧美激情精品一区二区| 边做饭边被躁bd在线播放| 国产精品jizz在线观看老狼| 综合一区无套内射中文字幕| 国产免费久久精品国产传媒| 我的兔子好软水好多在线看|